Full closure of the WEST bound lanes of SR-4 / Cowlitz Way will begin Monday, November 13, 2023 from 7 p.m. to 5 a.m. The closure will begin at the intersection of North Pacific Avenue and Cowlitz Way, and extend through NW 5th Avenue. These night time full closures should last about four days.
Traffic going north or south bound on NW 5th and Long Avenue will be flagged through the work area on Cowlitz Way. No turns either direction will be permitted at NW 5th/Long Ave and Cowlitz Way.
A posted detour will be in place. The detour route will be on Allen Street, starting at N. 5th Ave continuing over the Allen Street Bridge onto Catlin Street in west Kelso.
We ask you for your continued patience as we work to repair your city storm drains.